Control in Program Evaluation
Selecting appropriate dependent measures
- Normally need several dependent measures to evaluate all of the factors expected to change
- Should include at least one satisfaction measure
Avoiding bias in the evaluation
- Use objective measures whenever possible
- Measure community-wide effects, which are less susceptible to response set biases
Use strongest research design possible